what is Pre- commissioning.
Answers were Sorted based on User's Feedback
Answer / mahesh
Before start up a plant need to cheek instrument range, connection, parameter, soars. different cheeking only help of p&id.
Is This Answer Correct ? | 2 Yes | 0 No |
In addition to above ans w. r.t an instrument...
w.r.t to a system consists of PLC panel
Earthing should be done properly and proper earth resistance value...
Electronic earthing and body earthing..
UPS supply availability, all the cables.,
PLC-MCC
PLC- field
ensuring laid,terminated and loop checked okay...
PLC- SCADA PCs all Ethernet cables laid and terminated as per system architecture...
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / faiyaz
before start up the plant we check all the instrument and parameter with the water in process line that is called pre commissioning
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / faiyaz
pre commissioning is the process of providing the ability of a pipe line and piping system to contain product without leaking
Is This Answer Correct ? | 0 Yes | 0 No |
what are the definitions of input, output, command & signal according to instruments controlled by PLC using DCS System?
What is the difference between PLC and DCS?
What is the meaning of wet leg
describe yourself?
What is SLPC & MLPC? How it works?
what's the minimum level required of SIL (safety integrity level)to use fire and gas system?
Which standard of hazardous area classification used in India?
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?
What is first echo & echo window in radar type level transmitter?
How to calibrate DP transmitter by using HART communicator ?
IS there any effect of vortex in low pressure side of the transmiter after the orific in feed water line? if yes then what is the calculation?
what is compensation? temprature & pressure