how many stones require for rr masonery work 1cum.
Answers were Sorted based on User's Feedback
Answer / santosh singh
For random rubble masonry work
1.25 cu m of stone is required per 1 cu m work
Is This Answer Correct ? | 24 Yes | 2 No |
what is the least count of Total station
how much quantity of bending wire required for 1sqmts
How many stones require for 1200 Sq ft house
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
What kind of tests will conduct in plastering
how can we calculate steel value, depending on load
which is greater moment at centre or fixed end moment for a fixed beam with udl
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
How to find the requirement of cement and sand for the 1cum of rr masonry work
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
how to design mix ratio for concrete using M25?