Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


is excessive curing for brick work is good or bad for the
walls?



is excessive curing for brick work is good or bad for the walls?..

Answer / durga prasad

excessive curing is bad for the walls because of fungi is formed on the walls and it destroy the surface of the brick

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Will water damage concrete?

0 Answers  


How do we calculate absolute pressure?

0 Answers  


What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.

1 Answers   DLF,


Direct chairs over shutter / beside earth is prohibited because of ––

1 Answers  


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

0 Answers  


how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?

0 Answers  


To construct 100sq.yard what will be the cost in detail pls

2 Answers  


how to find hardness of water?why it should be determined?

0 Answers   L&T,


what is the difference between replacement of cement by groundnut shell ash

0 Answers   Harit Dharaa,


whats the field test of cement,aggregate and water

6 Answers  


what is the theoritical percentage of concrete cubes testing per day?

1 Answers   Fresher,


For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)