what is correlation between annual product quality review and
retrospective validation?
what is relation between the change control,change deviation
and non confirmatory report?
Answer / ranjana rawat
Annual product quality review APQR is generally a
comprehensive summery of all batches of a product
manufactured in a calender year. this summery contain all
the process parameters with the observed limits at different
stages of manufacturing as RM, IP & FP. the process
parameters and observed results are generally represented by
graphical representation. during the graphical
representation and compilation of APQR if any discrepancy
found we investigate about that discrepancy. this
investigation is known as retrospective validation. the
discrepancy may be of several types as of out of trend, out
of specification etc. to rectify all the discrepancy in
future batches is known as retrospective validation.
| Is This Answer Correct ? | 7 Yes | 1 No |
hello,sir my name is Anu. i want some sample question papers of masters in social work examination (dehli university) which is held on 29 june 2009. plz send me in my id- anu.sweet048@gmail.com
please sent me the previous papers for ICET TO MY MAIL ID.
i want previous question papers of juniour lectutrs for physics subject.
hiii....my ongc graduate trainee exam is scheduled next week ...i am from mba finance....can anyone please tell me kind of technical questions that they have asked in previous years...
Name the protein which transports oxygen in blood?
where is located in bangalore
Indian rubber obtained from the latex of which plant?
what was the period of the fourth five year plan
Which of the following is not considered to be an out put of the transformation process?
this is suresh studing llb 2nd year, i want to know about group1&2 examination means is there any easy way to prepare for that like reading by some books, then which books should i read,please give advice. thank u
what is correlation between annual product quality review and retrospective validation? what is relation between the change control,change deviation and non confirmatory report?
which type queston asked in nic exam?
ICET (321)