Answer / md murtuza ali
reinforced cement concrete
reinforcement means providing steel to concrete structure by that the structure will be strong in both compression as well as in tension.
remember steel is used for tensile forces and concrete is used for compressive forces
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / mayank jain
reinforced cement concrete, mixture of course and fine
aggregate with cement, supported with any other material like
steel, carbon fiber etc.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / umesh rai
(1)Reinforced cement concrete
(2)Remember steel is used for tensile forces and concrete is used for compression forces
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / rajalakshmi m
Reinforced cement concrete.....
Ingredients such as fine aggregate, coarse aggregate, cement,water and supported with steel,,,,,,
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the Laplenth for Reinforcement for Verticl and horizontal Structures as per IS code?
what is the stripping time of beam?
How to calculate construction cost of residential building in mumbai
is robosand to be use construction ? for slab ?, wall construction and plastering ?,is it give life?,which is best robosand or river sand ?
How will we calculate the number of cement bags in 6 foot by 6 foot footing?
convert area- 1 war = meter, 1 guntha = meter
Providing and constructing 150 mm thick brick masonry with brick in cement mortar ( 1:4 ) in partition walls, pilars, pedestals,supports etc. at all floors including RCC band at 1.0 M intervals, including scaffolding racking out joints and watering cleaning complete in sqm. Providing and constructing 230 mm thick brick masonry in Cum Providing and constructing 460 mm thick brick masonry in Cum Please provide me the rates..
explain yourself?
1 Answers Infosys, Omaxe, Siscom, TCE,
how many spacers we need for 1 ton reinforcement? aprox.
What are the different types of piles?
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
0 Answers Ajai Builders, Malhotra Associates,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)