what is the stripping time of beam?
Answers were Sorted based on User's Feedback
As per Indian Standards:
1. Vertical form work to Beams = 16 to 24 hours
2. Props to beams Spaning up to 6.00m = 14days
3. Props to beams Spaning up to 6.00m = 21days
4. Props to be refixed immediately after
removal of form work = 7days
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / yisahak
Generally form-work shall be stripped off after the concrete has attained 50% of the 28 day cubic strength, or when it attain twice the stress it will then be subjected after the removal of the form-work, which ever is greater.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sourish
Stripline is a beam diagnostics device used to measure beam
position/phase in particle accelerators.
Is This Answer Correct ? | 1 Yes | 3 No |
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
what are the grades of concrete?where and or what purpose a particular grade is used in a particular structure?
what is pure bending.
what is plum & mass concrete?
WHY SHOULD WE HIREYOU OVER THE OTHERS WAITING TO THE INTERVIEW?
What are the applications of modulus of elasticity?
Why ss Steel is not using in RCC concrete.
how i get all type of short type question answer about civil engg
what type of waterproofing and procedure using in building?
What are the different types of piles?
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
Plastering with cm 1:5 mix( one cement and five sand ) to 12 mm thick. How much Bag of Cement (50 Kg) and Sand (Cum)