Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
I've one slab of 24m x 43m. How to calculate required steel For this slab.
Define angular dimension?
How to calculate cut length of square shape stirrups?
what is your role of in previous company as a construction manager
What is binding spacing of the rebars at lapping zones.
What are the different methods for drawing an arc?
Where on net can i find IS Codes?
all technical question
How much binding wire required in 1 MT Reinforcement? How much Nails Required in 1 Sqmtr Area work progressed
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?