How much binding wire required in 1 MT Reinforcement?
How much Nails Required in 1 Sqmtr Area work progressed
Answer / sohan jaswal
For 1mt of steel, 8 to 10kg of binding wire is required.
Fir 1sqm of shuttering- 100 to 150 gm of nails are used.
Is This Answer Correct ? | 16 Yes | 0 No |
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
how much quantity of blocks, cement and sand is required to complete 1sq.m of CC Hollow blockwork. Size-16"x8"x8". Also what is the cement sand ration commonly used?
10 Answers ACC, CCCL, L&T, MFAR, Shoba Devlopers, SLS Developers,
productivity of steel fitter per day
How many number of cement bags per running metre are required to cast pileof M-20 grade
What does 'M' stands for in M24 bolt ?
Slump Values for works?
0 Answers Aditya Constructions, SVS Constructions,
what is the formula to calculate isolated footing
how to take concrete quantity for precast segment for viaduct project?
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
what is the difference between 2 legged to 4 legged stirrups?
why red bricks used for brickbat coba
which grade of concrete according to Indian Standard 800:2007 has highest strength?