how to calculate quantity of steel in a slab , coloumn and
beam
Answer / islam alam
According to thump role. Slab 0.75-2%. Beam 1. 5- 2%. Column 1. 5- 4%
Is This Answer Correct ? | 2 Yes | 1 No |
What are the methods to do a estimate.
How can u prepare mix design for concrete?
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
a simple instrument used for the measurement of colour in water is called
What are some structures that are subjected to fatigue?
What is missing report and how to prepare
In case of concrete cube test were all three molds are attached together do you cast your cubes simultaneously at the three molds every 50 mm or one after the other?
Why is the statue of liberty made of copper?
Can we use 16mm dia bar in place of 12mm dia bar in COLUMNS? (if given dia bar is not available on site)
how to calculate steel in slabs ?
steam curing is not used in which cement
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar