How to find the cement, sand, Aggregate, for m20, m25 grade of concrete..?
Answer / ankit sharma
for calculate the bags of cement for any section
vol.*dry volume* 28/ratio used
dry volume is empherical value 1.54
and 28 is bags in 1 cubic m
| Is This Answer Correct ? | 0 Yes | 0 No |
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
why we are condecting the slump test for concrete?
what is the diffrence betwen one way salb & two way salb?
As a proof of my analytical skills I was asked to give an example of a real life situation that i have solved analytically ? Can anybody give me a clue what kind of examples should be a suitable answer ?
Sir your company in receiver ment of civil engineering.
how to calculate number of bricks
How do you prepare Material Recovery Statement for deduction from contractors bills?
what is the meaning of sleeves in reinforced concrete????. where its coming???.
Prop carrying load capacity
how to estimate shuttering form work or how to take off material quantity???
what"s the abbreviation for P.C.C? what"s the formula to calculate 1m3 P.C.C consumption?
2 Answers ACIL, L&T, Punj Lloyd Ltd, Rajshree Construction,
how to calculate upthrust pressure of under ground water tank in wet soil?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)