Answer / sudhakar
for rigid pavement is 58-2002
for flexible pavement is 37-2001
| Is This Answer Correct ? | 7 Yes | 1 No |
If the design mix of M-30 grade concrete is 1:1.5:2.8 (By Weight)& W/C ratio is 0.45, then what should be the volumetric mix for the same ?
can i get civil engineering test papers.......?????
To construct 100sq.yard what will be the cost in detail pls
what is the main difference b/w compaction and consolidation
what is the hanekom repairing material after concreting work
how much CM required for Random Rubble masonry in CM 1:6
Given a selection of 28 day cube test results for concrete placed of design mix C 35 and not all of which are greater then 35 MPa, how does one decide if the concrete in place is satisfactory. Are there a minimum number of cubes that need to be tested to decide that?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
how much one carpenter can doing shuttering of slab in one day
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
what is the weight of sand,corrse aggregate and steel,for 1cum
1 Answers Gulf Asia, Jade Software, Sand,
WHAT IS NON DESTRUCTIVE TEST?PLEASE GIVE ME THE PROCEDURE?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)