With reference to construction of state highways, please let
me know the total Bill Of Quantities as per the following
details:-
1) Subgrade - 500 mm
2) Granular Sub-Base (GSB) - 200 mm
3) Wet Mix Macadam I (WMM I) - 150 mm
4) Wet Mix Macadam II (WMM II) - 100 mm
5) Dense Bituminous Macadam (DBM) - 60 mm
6) Bituminous Crust (BC) - 40 mm
Road Length is 44 Kms.
Road Width is 7 mtrs.
Please provide the BOQ of each layer as per Compacted Factor
& Loose Factor both.
Also, if possible please provide me the approximate details
of total material required (all categories viz. soil,
gravel, stone aggregrate, sand, bitumen etc.) as per general
mix design prevailing in India.
Thanks & Regards
--
Rokr
No Answer is Posted For this Question
Be the First to Post Answer
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
0 Answers Bhoomi Engineers Builders,
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
How many bags required for 1cum grouting?
How does a traffic light signal work ?
Which word is coolest among the 26 alphabets?
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
What is meaning of Canceled/Flat Beam. What is difference between them? Both type of beam can bear same load if size (width)of the flat beam is increases and depth is same as slab thickness? Kindly suggest to me.
how many bricks are requir for one unit ho we will caculate
How to find the cement, sand, Aggregate, for m20, m25 grade of concrete..?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)