what happens to a turbo alternator if it get trip and 1 out
of 3 poles of circuit breaker in close condition
Unbalanced current will develope till the upstream end
circuit breaker protection detect ( inverse time overcurent
and earth fault)and trips and isolate the fault.
The turbo alternator can run till negative sequence
charactristic constant limitation.I2t=K. Only generator
winding overheat and some time sparks,de[pends on fault.
It is also observed that major accident took place not only
damaging generator circcuit breaker pole damages,arcs and
body cabinet,arc chute burned,turbo alternater bearing
failure nted.
Is This Answer Correct ? | 2 Yes | 0 No |
If the generator will not synchronize, what will you do?
How to reduce -234126219.6403 MVAr generation and by what?
Pl. brief about break-down maintenance of machine tool.
what is the condition for vector group of Dyn5
what is the voltage between nutral and earth?
1 KVAR = 1.3Amps but, 25KVAR capacitor/690V capacitor takes just 21Amps as leading current, what is the reason? Please explain...
Explain the working principle of Synchronous Generator and Assynchronous generator?
In VVVF drive voltage is varying in accordance with frequency.My question here is How much will be the voltage in the inverter side if the frquency is set for 10Hz ?
plz tell me in detail about c.t. and p.t. ?
Explain cos(theta) and Sin(theta)
Just a silly question but just to make my curious mind bac to normal - Why was not 67 and 67N relays built into a single relay as i have noticed that the R,Y,B CT wiring end up into the 67 relay while the common of the R,Y,B CT wiring end up into the 67N relay. Then it was better if a single relay was manufactured just like the distance relay (21). Another question i would like to ask is - how do we know where the 67 and 67 N relay has to be placed.why is it not placed at the transformer bay? In the substaion that i am working -i have noticed that it is placed between a breaker and a common double bus bar and this line bay is connected to another substation at a remote place which is furthur connected to a load. B U S______CT for 67 & 67N ______Breaker _____ remot s/s. B A R
What are the condition for parallel operation of transformers?