Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How do we calculate the building footing calculation ?

Answers were Sorted based on User's Feedback



How do we calculate the building footing calculation ?..

Answer / ds raju

Question is not clear. Is it design calculation ? or RCC
volume of the footing.

Design calculation depends on the safe bearing cpacity of
the soils and load on the footing.

Concrete volume can be calculated based on the shape of of
the footing.

For Rectangular/ square type : LxBxH
For Trepezoidal type : h/3 (Area at bottom-A1 + Area at top-
A2 +SqRt of (A1xA2)

Is This Answer Correct ?    36 Yes 2 No

How do we calculate the building footing calculation ?..

Answer / r.vandhana

the calculation varies for each type of footing

Is This Answer Correct ?    24 Yes 4 No

How do we calculate the building footing calculation ?..

Answer / sachin kesarkar

FOR RECTANGULAR FOOTING VOLUME= L*B*H
WHERE L=LENGTH B=BREDTH H=HEIGHT
FOR TRAPEZOIDAL FOOTING VOLUME=h/3(A1+A2+ROOT A1.A2)
WHERE h=HEIGHT A1=TOP SURFACE AREA A2=BTM.SURFACE AREA.
THERE ARE ALSO THE FOOTINGS WHICH ARE NOT PERFECTLY
TRAPEZOIDAL, IN THAT CASE WE HAVE CALCULATE IT WITH
TRAPEZOIDAL HAVING 5% VARIANCE.

Is This Answer Correct ?    20 Yes 4 No

How do we calculate the building footing calculation ?..

Answer / srinivasan

1) FOR RECTANGULAR OR SQURE PORTION L X B X H WHERE L=
LENGTH B= BREADTH, H= HEIGHT

2) TRAPEZOIDAL PORTION H/3 (A1+ A2)+SQRT (A1*A2)

Is This Answer Correct ?    9 Yes 2 No

How do we calculate the building footing calculation ?..

Answer / imtiyaz

H/3 (A1+ A2)+SQRT (A1*A2)

Is This Answer Correct ?    10 Yes 4 No

How do we calculate the building footing calculation ?..

Answer / guest

width of footing can be calculated as
w= 2*l + 30
depth of footing can be varied as soil change

Is This Answer Correct ?    3 Yes 9 No

How do we calculate the building footing calculation ?..

Answer / guest




Dear friends generally we do this footing calculation like
this two method =
(A)1st method =i)1.500 m x 1.500 m x 0.500 m = 1.13 Cum.
ii)½ x ( 1.500 m + 0.250 m ) x 1.500 m x 0.200 m = 0.260
Cum. (B)2nd Method =i)(1.500 x 1.500 x 0.200)+ (0.250 x
0.250 x.0.250)= 0.460 Cum.
ii) ( 1.500 x 1.500)+ ( 0.250 x 0.250)/2 x 0.200 = 0.231
Cum.
( But I think it is not proper procedure so please you do
properly )

Is This Answer Correct ?    10 Yes 33 No

Post New Answer

More Civil Engineering Interview Questions

why do we not deduct volume of steel to find actual volume of concrete in practical???

0 Answers   Lodha,


what is difference between expansion and construction joint?

3 Answers   Save the Children,


RCC colums of 15"X9" each, roof height 10.5'ft, total pillars 12 nons. Span between pillar to pillar is 14/20/20 length wise and 17/14 width wise. Total Slab area 2400 sft and plinth area is 1900 sft. beams are 12"X12". kindly calculate load factor per sqft.

2 Answers   ABS Construction, L&T,


1)What is the total volume of aggregates required for 1cu.mtr.solid hard concrete? 2)What is total mass of wet concrte and dry concrete after 28 days of M25? 3) Is 28 days strength is the final strength of concrete or it gets increasing as the time period increses.? 4)What is the volumetric proportion of concrete grade of M25.M30,M35,M40

1 Answers   AVS,


can we go for short rcc column without any steel rienfocement carrying truely axial load only???(No other load acting on it such as wind load,earthquake & lateral earth pressure)

2 Answers   Lodha,


how many bags of cement are needed to make a cement mortar of 1:3

5 Answers   ABC, DBL, DHFL Dewan Housing Finance Corporation, VV, WADAN,


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

0 Answers   RS Construction,


how to estimate the earthwork,earth-filling for an isolated foundation

4 Answers  


rate analysis of shuttering

2 Answers  


in the footings first which reinforcement bar has to be layed as per design criteria.

3 Answers  


Deshuttering time for slab 6.15 meter

2 Answers  


How much cum. Brick work can do by 1 madon

0 Answers   DLF,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)