Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


E.B sending end to receiving end 33kv ug cable laid
8Km,receiving end to ss1,ss2,ss3,ss4 all are Approx 800
Mtr,can go for 33KV to 430V or 33kv to 11kv in receiving end
and 11kv to 430 near ss ,which one is good for technically
and economically.



E.B sending end to receiving end 33kv ug cable laid 8Km,receiving end to ss1,ss2,ss3,ss4 all are A..

Answer / tapas

Receiving end----- should be 33/11 KV
l
l Distance between Receiving ss and distribution is 800 Mtr
l
ss-1, ss-2, ss-3, ss-4-- -- Should be 11000/430 V

This option is better as 800 Meter cable cost for each substation will be lower in HT and loss will be lower

Is This Answer Correct ?    2 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

6.6Kv feeder feeding tow step down transformers-415V-,what the possible consideration for parrellel operation?

1 Answers  


a.c&d.c motor&generator

2 Answers   Vizag Steel,


What's the differs between voltage & current & emf.

1 Answers   CTS, NTPC, TCS,


our plant maximum demand has 500 kva.need to suggest me to maintained pf 0.98.how much capacitor bank will be connect to the supply line.

1 Answers  


we want low electricity at lower speed of fan.what we have to do?

5 Answers  


can we use 220 volt 15 w a.c. lamp on 220 volt d.c.

6 Answers   TCL,


how can we check a fully charged battery?

6 Answers   BEML, Singareni Collieries,


what is different between grounding and earthings?

4 Answers  


Why the cost of CT increases with the decreasing of its CT Ratio (Technical Reason)?

2 Answers   Vedanta,


How can you sized or estimate the ligthning arrester current rating?

0 Answers  


Why are cables rated for 40 KA for 0.25 Sec fault current rating?

0 Answers  


how to measure the transformer resistance values(dyn11)?and howmuch the minimum value?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)