Answer / pramansrivastava
.75 kg to 1.1 kg steel required for 1sqft slab.
Is This Answer Correct ? | 138 Yes | 22 No |
Answer / sudhir patil
its totally depend on the design of that perticular
structure.Normally its seen that G + 7 structure is having
2.8 to 4 kg per Sft & High rise building having 9 to 12 kg
per sft.
Is This Answer Correct ? | 48 Yes | 15 No |
Answer / babar
It is only depend that which dia of bar in slab is being used
Is This Answer Correct ? | 19 Yes | 3 No |
Answer / karthick
it is depended upon the structural design but normally for a nominal slab with single floor it is 1.3 to 1.5 kg of steel is used
Is This Answer Correct ? | 20 Yes | 7 No |
In multistory building
----------------------
1- Raft + Retaining wall (In case basement)--- 8kg/sqft
2- basement roof slab i/c non tower slab,
( Column from basement floor to stilt floor + basement roof
slab slab)-- 6.5kg/sft
3 - typical floor / for each floor ___ 4.5kg/sft
Is This Answer Correct ? | 17 Yes | 7 No |
Answer / waseem khattak
you can only assume or can calculate from structure drawing
normaly 30 ton steel required for 1 kanal plot with basement
and rcc wall
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / faizan
i think the 1 sq fit area is consume of 1.5 to 2 kg/sq fit
Is This Answer Correct ? | 5 Yes | 7 No |
mix design procedure for 1:6 cement mortar
How will find compresive strenth of M20,M25,M30 after 7day,8day 28day etc please drive step by step not shot?
How much steel required in one cubic meter RCC Main girder
how the load will be transfer from pile foundation to soil?
Which type of question ask for written test for civil diploma trainee
Instead of sand blasting is there any method to clean the rust of steel ???
what is periode of deshuttering of slab our span length 21m,and width 2.5m grade of concrete M-35
productivity of steel fitter per day
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
Current ctc and expected ctc? Should i tell or as per Compnany norms? I am not fresher (1 yr exp) so how should i Face it
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
I have completed building maintenance course in mcvc stream .. can I apply for the post of " sthapstya abhiyantriki sahayyak"?