Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How much steel required in 900 square feet slab?

Answers were Sorted based on User's Feedback



How much steel required in 900 square feet slab?..

Answer / dinesh babu

its depends on load (self pluslive load), but its assumed
as 1.5kg to 2kg per sqft

Is This Answer Correct ?    143 Yes 37 No

How much steel required in 900 square feet slab?..

Answer / silpa

1 SFT= 2KG
900SFT=1800KG OR 1.8MT

Is This Answer Correct ?    112 Yes 41 No

How much steel required in 900 square feet slab?..

Answer / goutam ray.

0.8%steel
say, slab thk.100mm.
then, volume of conc. 900*4"=297 cft.=8.41 cum.
require of steel: (8.41*.8%)*7850= 528 kg.
say, slab thk.150mm.
then, volume of conc. 900*6"=450 cft.=12.74 cum.
require of steel: (12.74*.8%)*7850= 800 kg.

Is This Answer Correct ?    80 Yes 24 No

How much steel required in 900 square feet slab?..

Answer / suresh

USUALLY 1 CUM CONCRETE USING 80 TO 100 KG,
900SQFT SLAB = ASSUME THICKNESS OF SLAB=6"
900*.5=450CFT/35.28=12.755CUM
12.755*100=1275KG

Is This Answer Correct ?    55 Yes 18 No

How much steel required in 900 square feet slab?..

Answer / suresh

Steel for roof slab = 100 to 120 kg/cum
900sft assume thk 5" =375cft/35.28*120=1275kg
1cum=35.28cft

Is This Answer Correct ?    26 Yes 6 No

How much steel required in 900 square feet slab?..

Answer / sjtbehera

thumb rule- .15% og b x d

Is This Answer Correct ?    19 Yes 8 No

How much steel required in 900 square feet slab?..

Answer / prakash

1st conformer its residential building or commercial 1.5 to 2.0kg/sft and 3.5 to 4.0 kg/sft

Is This Answer Correct ?    21 Yes 12 No

How much steel required in 900 square feet slab?..

Answer / s.a.ganesh

Has been work out based on design load,live load,wind load,bending moment & SBC of soil. Then calculated the steel

Is This Answer Correct ?    3 Yes 0 No

How much steel required in 900 square feet slab?..

Answer / shalender kumar

.12%to .15% of the total area in cum

Is This Answer Correct ?    11 Yes 9 No

How much steel required in 900 square feet slab?..

Answer / nilesh g. shende

Steel depends on size of the beams
if beams are of 230 x 300 then slab will require 1.5 kg/ sq.Ft
if beams are of 300 x 500 then slab will require 3.5 kg/ sq.Ft

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Why sea sand and desert sand are dont used for construction

1 Answers  


How many Steel used in 1 cum tower foundation

0 Answers   STCS,


we are use us steel in PQC road

1 Answers   Student,


what is the difference b/w GSB and WMM?

9 Answers   DBM,


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

0 Answers  


Why we use Reinforcement out side of the column not in centre

4 Answers  


Cement consumption of one cubic meter of aerocon blocks masonry?

0 Answers   Sathiapal Engineers,


WHAT IS YOUR EXPECTED SALARY?

0 Answers   ADITI, Allfon, Amazon, Ralph Lauren, Starbucks,


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

0 Answers  


I am constructing a house having 20' X 19' hall. Do I need to go for a concealed beam. any alternative please? Thanks if a design is provided.

5 Answers  


For the construction project what capital cost has to be taken in consideration?

0 Answers  


how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?

1 Answers   LiveCon, Sobha Developers,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)