what is the least-count of plane-
table,dumpy,theodolite,compass,tachometer?
Answers were Sorted based on User's Feedback
Answer / akash verma illiterate enginee
dumpy levey: least count 5mm as it is based on staff
reading thats why least count is 5mm.
theodolite: least count is 20"
compass: least count is 30'
| Is This Answer Correct ? | 751 Yes | 62 No |
Answer / shivkumar
dumpy levey: least count 5mm as it is based on staff
reading thats why least count is 5mm.
theodolite: least count is 20"
compass: least count is 30'
| Is This Answer Correct ? | 257 Yes | 27 No |
Answer / sanjay kumar
least count of leveling staff is 5mm because there is no
measurement or level of any berm,concrete structure or any
other item in civil engineering line whose multiple is
other than 5.
| Is This Answer Correct ? | 175 Yes | 18 No |
Answer / yogesh naik
height of building can be measure by ?
techeometer
| Is This Answer Correct ? | 115 Yes | 12 No |
Answer / naveen kumar
Total station : Least count for total station for angle is 1° & Distance is 1mm
| Is This Answer Correct ? | 87 Yes | 37 No |
Answer / nilay patidar
Theodolite least count is 20 to 30 secods
| Is This Answer Correct ? | 58 Yes | 29 No |
Answer / juvva anitha
least count of dhumpy level is 5mm
least count of theodalite is 20''
and for prismatic compass is 30'
| Is This Answer Correct ? | 26 Yes | 1 No |
Answer / pankaj yadav
least count of theodolite 20''
prismatic compass 30'
| Is This Answer Correct ? | 27 Yes | 6 No |
Are you a team player?
Why we do design mix of concrete when there is nominal method using the IS-Code available ?
14 Answers Engineers India Limited,
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
The company is following same question pattern and giving same questions in all year for all batches from the starting of company they didnt even able to frame new question,,so guys if u want to place in cccl just mail me i will send the questions....ramyakvb@gmail.com....if u mug all those answers u will be selected no proper selction procedure is considered so it is better to place in some other company...All The best dont attend cccl
What is minimum tensile strength required for structural steel works ?
what is the I.S. CODE of RCC
How to do lineout of building
What is Time period of a building and its relation with frequency ?
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
What was asked in isro civil interview
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How to calculate the capacity of Water tank?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)