how many days we should curing for
plastering,brickwork,concrete?
Answers were Sorted based on User's Feedback
Answer / senthil kumar p
Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound
Is This Answer Correct ? | 115 Yes | 6 No |
Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound
Is This Answer Correct ? | 79 Yes | 8 No |
Answer / ganesh mapari
7 Day for Brickwork and Plastering
14 Days for Concrete
Is This Answer Correct ? | 36 Yes | 3 No |
Answer / udaya
It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter
Is This Answer Correct ? | 24 Yes | 7 No |
Answer / ram mohan rai
Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / engr.sameer
concrete need min 7 days contineous curing
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / muraliyadav
This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete
Is This Answer Correct ? | 10 Yes | 12 No |
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
what is the steel difference between np-2 and np-3 pipes and weight also
Why we add salt in silt content test of sand? Full reason ?
What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?
When column of building is abutting the boundary line,then suitable footing advised is
10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required? 2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?
What is the shelf life of a refractory used in boiler furnace ?
when will the position neutral axis shifted in beams
what is flexible and rigid footing?
0 Answers IBM, Wah Engineering College,
Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?
how much volume is one bag cement of 50kg
15 Answers Portland, RJB, UltraTech,
which purpose we are provide groove at sides of door & window frames, columns & beams