how many days we should curing for
plastering,brickwork,concrete?

Answers were Sorted based on User's Feedback



how many days we should curing for plastering,brickwork,concrete?..

Answer / senthil kumar p

Any cement based products or structures the minimum curing
period is 7 and maximum 28 days for concrete unless
otherwise you are using any curing
compound

Is This Answer Correct ?    115 Yes 6 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / jai.vignesh

Any cement based products or structures the minimum curing
period is 7 days unless otherwise you are using any curing
compound

Is This Answer Correct ?    79 Yes 8 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / s

7day min

Is This Answer Correct ?    43 Yes 5 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ganesh mapari

7 Day for Brickwork and Plastering
14 Days for Concrete

Is This Answer Correct ?    36 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / venkataratnam.y

minimum 7days

Is This Answer Correct ?    21 Yes 3 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / udaya

It is 14 days normally. Normally we follow 14 days in summer
and 7 days in winter

Is This Answer Correct ?    24 Yes 7 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / ram mohan rai

Curring should start as soon as concrete start hardening
till at least 7 days depend upon weather condition.

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / engr.sameer

concrete need min 7 days contineous curing

Is This Answer Correct ?    12 Yes 0 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / naveen

28 days.

Is This Answer Correct ?    20 Yes 21 No

how many days we should curing for plastering,brickwork,concrete?..

Answer / muraliyadav

This is
depending upon
the structural
element as well
as depends on
the type of
cement can be
used in
construction
site works .the
minimum 7days
required for any
structural
element as
beams,columns,slabs
in these days
concrete did not
get full
strength only
upto 25%, if 28
days required
strength as 70
to 80% of
concrete

Is This Answer Correct ?    10 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

0 Answers  


what is the steel difference between np-2 and np-3 pipes and weight also

0 Answers  


Why we add salt in silt content test of sand? Full reason ?

1 Answers   CCCL, JSW,


What is HEAVIER? A kilo of SAND OR A kilo of GRAVEL?

15 Answers  


When column of building is abutting the boundary line,then suitable footing advised is

0 Answers  






10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required?       2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?

1 Answers  


What is the shelf life of a refractory used in boiler furnace ?

4 Answers   Monster,


when will the position neutral axis shifted in beams

3 Answers  


what is flexible and rigid footing?

0 Answers   IBM, Wah Engineering College,


Why do we use badarpur or crusher sand with coarse aggregate in a concrete mix?

1 Answers  


how much volume is one bag cement of 50kg

15 Answers   Portland, RJB, UltraTech,


which purpose we are provide groove at sides of door & window frames, columns & beams

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)