How can we Integrate AP,AR,CM & FA to GL? What is the
procedure need to fallow as a functional consultant?
Answer / shrikant
There is nothing specific which we need to do to integrate
these modules. Oracle takes care for that. Only the
sequence of configuration is important. One should
configure the instance in following sequence
1. GL
2. AP
3. FA
4. AR
5. CM
| Is This Answer Correct ? | 5 Yes | 5 No |
Advance paid to Employee 1000$. Employee incurred expenses of 800$ and he returned 200$. What is the Accounting Entry?
While setting up the cross validation rules is it necessary to enable the SECURITY RULE check box along with CROSS VALIDATION RULE check box in flexfield structure. plz clarify my dt
you have create a purchase order, it is approved also. now you want to change in the purchase order, hoe can you do that?
What r the Documents We can create while implementation?
as a functional consultant what was your role in implementation project and supporting project?
Where is the method of Supplier Number set? At what level is the supplier numbering controlled?
How many views are generated when compiling flexfield structure ?
How we will generate balance sheet through r12
Payable open interface import? (Expense Report Import)
what is the link between Ar and PO modules? waht is link between ap and po? what is link between gl and po? what is link between gl and ap? what is link between gl and ar? what is link between ap and ar?
Explain TCA Architecture ?
process from PO to Asset creation, with accounting entries.?