What"s mean by term of BOQ in construction?
Answers were Sorted based on User's Feedback
BOQ means "Bill of Quantities".
Actually the BOQ is submitted by the Design Consultant to
the Contractor. Contractor has to quote the rates for each
items in the BOQ. Then finally the contractor who has
quoted the nominal rate will be selected for the particular
work.
Is This Answer Correct ? | 214 Yes | 7 No |
Answer / mohamed ibrahim
BOQ means bill of quantity..this is important to the
contracters...the work not mentioned in BOQ is done by the
contracter will not paid by the client any more..
Is This Answer Correct ? | 47 Yes | 16 No |
Answer / ashutosh aryan
A bill of quantities (BOQ) is a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. It also (ideally) details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding.
Is This Answer Correct ? | 17 Yes | 0 No |
Answer / sayed obaidullah
BOQ means bill of quantities in this the rate will be mention by contractor and at the end of month will be send by construction manager and received by finance and finance will calculated that the project is made how much profit.
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / asanga
The Bills of Quantities will only be used for valuing monthly progress and variation
Is This Answer Correct ? | 13 Yes | 7 No |
how to take quantity of steel per cum in columns
2 Answers ERRA, Skyline Builders,
binding wire requirement in rcc structures
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
what type pressure pipe use in sewerage & water supply?
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
how to prepare site mix design
what do you mean by yeild stress of a material? What will happen when hit is given to cement?
what is cbr valuve
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
how to calculate steel quantity of column from steel design
CROSS SLOPE OF Macadam Construction
Mention what are the composition of a landfill?