1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3

Answers were Sorted based on User's Feedback



1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / matu singh chauhan

one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days

Is This Answer Correct ?    474 Yes 70 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / gowrishankar

Plastering per day 8 hours one mason and helper will cover 10 m2

Is This Answer Correct ?    315 Yes 61 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / jarrar siddique

1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.

2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.

3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.

Is This Answer Correct ?    77 Yes 8 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / vijay kumar mukhiya

80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper

Is This Answer Correct ?    71 Yes 14 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / sunil patel

One mason and one Labour minimum 100 sqf plastering should be finished in 8 hours.

Is This Answer Correct ?    31 Yes 8 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / yashvant

ready made plaster work one meson can do 12 square meter per 8 hour duty and 2 hour overtime this is enough work as per construction company standard measurement in Dubai.

Is This Answer Correct ?    34 Yes 15 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / rajan pandey

their two ans is right

Is This Answer Correct ?    13 Yes 3 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / gowtham

One Mason and one helper per 8 hour plaster work for 10 m2 and overtime 2 hours 2 m2.totally 12 m2

Is This Answer Correct ?    6 Yes 5 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / yashvant

80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.

Is This Answer Correct ?    20 Yes 23 No

1) One mason per day how many cu.m work will do as per list given a) Brick work,hollow brick work ..

Answer / ramji

One meson one helper 8hours150sq,m plenty plaster

Is This Answer Correct ?    1 Yes 22 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate the weight of bending wire for 1sqmts .how much bending use for 1ton steel

5 Answers   L&T,


Approximate weight of a modular brick?

2 Answers  


In two way slab where should we stop the work at end of the day?

2 Answers  


In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.

0 Answers  


Explain the Strength of brick?

0 Answers  






brickwork labour rate per cum ?

0 Answers   MEIL,


What is NP in "NP BIB Tap"?

2 Answers   APTransco,


what is the diff between sudden loading and impact loading?

8 Answers  


What should be percentage of silt content in sand?

21 Answers  


what is westage % for steel, concrete,tiles,pains as per indian staderd code?

6 Answers   DLF, Engineering, Lodha, Tata Steel Limited,


which chemical is used for corroded steel

3 Answers  


Under what circumstances should pot bearings be used instead of elastomeric bearings?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)