1) One mason per day how many cu.m work will do as per list
given a) Brick work,hollow brick work and cc block work and
plastering how many m2 per day 2) one carpenter per day how
many m2 will do as well as scaffolding how many m3
Answers were Sorted based on User's Feedback
Answer / matu singh chauhan
one mason bricks works in foundation and plinth level with
cement motor = 1.25m3 per day
bricks works in structure with cement motor =1.00m3 per day
plastering in a one days=10 m2 per days
| Is This Answer Correct ? | 477 Yes | 71 No |
Answer / gowrishankar
Plastering per day 8 hours one mason and helper will cover 10 m2
| Is This Answer Correct ? | 321 Yes | 61 No |
Answer / jarrar siddique
1. Brick work in cement mortar in foundation and plinth 1.25cum (45cuft)per mason/day, or 600 Bricks/day minimum.
2. 12mm (1/2) plastering with cement mortar 8.00sqm (80sqft)per mason/day.
3. Supplying, fitting, fixing and removing shuttering & staging 7sqm/carpentar/day.
| Is This Answer Correct ? | 78 Yes | 8 No |
Answer / vijay kumar mukhiya
80 blocks can done by a mason in a day with 1 helper and 10m2 plaster work done by a mason with 1 helper
| Is This Answer Correct ? | 73 Yes | 14 No |
Answer / sunil patel
One mason and one Labour minimum 100 sqf plastering should be finished in 8 hours.
| Is This Answer Correct ? | 31 Yes | 8 No |
Answer / yashvant
ready made plaster work one meson can do 12 square meter per 8 hour duty and 2 hour overtime this is enough work as per construction company standard measurement in Dubai.
| Is This Answer Correct ? | 34 Yes | 15 No |
Answer / gowtham
One Mason and one helper per 8 hour plaster work for 10 m2 and overtime 2 hours 2 m2.totally 12 m2
| Is This Answer Correct ? | 6 Yes | 5 No |
Answer / yashvant
80 no. blocks per 8 hour duty and 2 hour overtime is enough as per company standard.
| Is This Answer Correct ? | 20 Yes | 23 No |
Answer / ramji
One meson one helper 8hours150sq,m plenty plaster
| Is This Answer Correct ? | 1 Yes | 23 No |
The corrosion resistance of a material is.
For M30 grade how much cement bags will need for one cubic meter qty
apparatus of soundness test of cement
what is the clear cover for shearwall?
parts of stair-case?
Special thing in designing a overhead reservoir ? which is different from an ordinary design
how we can say that concrete is a plastic concrete
How much cement,sand,bricks and water needed for 1square metre brick work?
Is there any possibility of changing in dia of bar from lower to higher (i.e Lower dia bar at bottom and Higher dia bar at top)
How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft
. What three Specific Job Positions do you target from the Company
in M-20 Grade of concrete what do u mean by (M)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)