Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.
2015how will you segregate the alarm levels in alarm management system during factory Acceptance Test
1925Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
1765What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
1848
i need diploma electronic and comunication question papers
Consumption of Binding wire for fixing of cover block in vertical surface
In EDO ACBs what is a purpose of closing coil and motor, what is the operation of these devices are they inetconnected. means if we give supply to motor and by BCS we charge Closing coil,what exact is operation is and how it charge a spring of ACB. Sir if anybody has an wiring diagram please send me the link to operate and EDO breaker.
how is corona effect can be detected??
What are to be checked in an induction motor?
What do you mean by component versionig?
How to calculate the External Resistance required for 60HP slipring motor in case no any data of the Motor is available???
Define open loop control system.
Explain what made you choose aerospace engineer line as your career?
construction of current tranformer
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
would you please give me any idea about the BARC interview question on electrical? i have an interview on 1st july.....plz hlp me.......its urgent......
what r substations?what r there work?why voltages r incresed and then reduced during distribution of power
how do i commission a distribution transformer knowing all its ratings and transformation ratios?d
The ripple frequency in output of fullwave bridge rectifier is a. Half the input b. Twice the input c. Same as input