FROM THE WHICH FONT USED MEANS SMALL SIZE TEXT IN A0 SIZE PAPER, NEED TO SITE EXECUTION PURPOSE DRAWING DRAWING NEED TO TAKE PRINT IN A3 SIZE ALSO MEANS WHICH FONT USED MEANS POSSIBLE TO READ BOTH PRINT
1 3452Dear Sir, I got 90kilowat and 3 face for my house.So which cable is the best for my home main line. Thanks Bashir Ahmed e-mail: bcon.ba.bd@gmail.com
2229RCC colums of 15"X9" each, roof height 20.5'ft, total pillars 36 nons. Span between pillar to pillar is 16/20/20 length wise and 16/14 width wise. Total Slab area 8000 sft and plinth area is 1900 sft. beams are 12"X9". kindly calculate load factor per sqft.
ITI,
1 3834In a small scale residential building 13M rod cut by column post. that rod divided by 2 nos or 3nos which is best?
1 3285Post New Architecture Design AllOther Questions
what are the thump rules of taking BOQ of building construction?nallaPERUMAL 9003858728.
Structural wall & slab : Binding wire fixing is alternatively spacing is correct or wrong?. binding wire fixing is all spacing is must or not?
why you want to become artictecture
how do we calculate lux for museum building? what is the procedure?
. A BSC can contain ___________ number of BCF packs.
I have 14 diffrent shape gogles.how can I use this in architructure design??
How did you decide to go into architecture and what did you do to prepare for this field of work?
what is CEPT and ETSI for telecom?
Is DataStage Designer, a thin client or a thick client?
how to know low voltage and high voltage ranges for electrical machinery ?
What is the more accurate formula to convert wet concrete to dry aggregate instead of the 54% method?
ssc cgl 2010 may tax assistant ki cut of kya hogi
How i can calculate material for 1000 sq foot plot.
I am Planning to Contruct a floor appartment on my own thro a Contractor . How to estimate the Constrction Cost , to negociate with the Contractor.
how many steel rod of the cilling 10'x10'