Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
1574We have 90mX100m hangar with 16 no.of supporting pillar. It is required to provide power supply on all pillars. what is suggested earthing scheme for hangars.
1608how we can calculate the range selection time in mobile communication? or channel searching time?
1800Q.Large no of thyristors are used in HVDC transmission to improve______ a) current rating b) voltage rating c) Thyristers are available at high ratings d)
5 7004If the time delay of relay with TMS setting 0.1 is 10 sec, then what is the time delaty when the TMS setting is changed to 0.5
1 5279Which type of power plant is more easier to produce electrical power at economical condition?
8 9048Post New HAL Interview Questions
What is xml file in android?
Do you know what is similarity and difference between truncate and delete in sql?
Once I have the Java 2 SDK, Standard Edition, from Sun, what else do I need to connect to a database?
Why set is used in java?
Does https prevent csrf?
What is powerpoint and its features?
Define static constructor?
Tell us which do you think is more important: model accuracy or model performance?
What are the factors that for influencing photosynthesis also interfere with the gross primary productivity?
What is maximum power transfer theorem?
How to eliminate duplicate rows from flat file?
realationship bewteen bank& customer.
Is windows defender enough 2019?
Explain the different stock types in wm?
What do you understand by classes in typescript?