what is bending moment, for simply supported slab ? how do
you calculate ?

Answer Posted / umar ehsan

Area of shear force is called bending moment...and for simply sprtd..wl*l/8.

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the Hardness of M-40 grade concrete, general and theoratical

1671


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

1946


List out some of the checking’s, done at the completion of construction?

724


How much area will be covered in 1 litre of Velvet touch paint in normal wall condition

959


What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?

1971






what discoveries did you have in relation to your course?

1667


What is the strength of 1:6:12 mix?

2617


we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level

2097


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

647


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

1929


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2052


Prepare a Schedule for a Highrised building from starting stage to Handover?

1509


In reclamation works what are the importance of geotextiles and sand?

705


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1373


Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.

2783