HOW TO CALCULATE UPS BATTERY BACKUP TIME
Answer Posted / j.prakash
after the load and running time is decided the battery bank
size can be calculates the first calculation is to divide
the laod in watts by 10 for 12 v systems or 20 for a 24v
system ....
resulting in the number of amps required from the batter
bank..
AN Example of this calculation is:
1.total watts=1000watts.
2.amps from 12v battery =1000/10=100amps DC.
FOR A 12V BATTERY 100AMPS DC*3H=300AMPS HOURS(AH)
| Is This Answer Correct ? | 4 Yes | 3 No |
Post New Answer View All Answers
how to find 5 kilo meter long under ground 33 kv cable fault location if IR VALUE shows 0.05 M ohm @5000 volt.and cable fault locator shows some time fault distance 3 kilo meter ,3.7 kilo meter and some time 1 kilo meter? now how to find the fault location that where is leakage. note--it is tested with 5000 kv megger and insulation resistance is 0.05 M ohm. and some time 0.03 M ohm comes.
what is harmonics? what are the factors it will depend upon
what is p.s impedance measurement test in earthing transformer?
-What shall be short circuit current of LV switchgear for a 1000 kva, 11.415kv, 3 phase tranformer with 5% reactance.
what is x'mer ,isolation x'mer & yltra-isolation x'mer?????
How Diesel Generator start ?
can any one tell me about the Extra low voltage systems?From where we give supply to these type of systems??
What is quadrantal symmetry?
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
role of europe union in UK safety legistlation (electrical safety)
hello friends..... any one have papers or any study materials?sail ,hpcl...?
What are the types of instrument transformer?
surge tank, hrc fuse, earthing transformer, firm power objective type
Why it need to form a capcitor when it not been in use from three or two year. Plz describe it technically.
why did youi choose this career?