Which is not formally included in Test Plan?
1)Features to be tested 2)Incident reports 3)Risks 4)
Schedule Pls reply .Thanks
Answer Posted / babitha.b
To include:
Features to be tested since some of them can be test at
rela time for some of them we can test using simulator.if
we give them what we r testing then at other end they can
arrange for other cases.and also some internal features
also we cant test just like internal memory or addresses.
so its mandatory to include it.
Risks: here we might be saying some risks like environmenmt
supports or operating systems we using,language dependent
issues.
assumptions and constraints also we can include in test
plan.
schedule: conveying them about our flow of testing which
means first we perform GUI testing,fucntionality
testing,integration and system.
But incident reports is not necessary.Because we would be
updating our test plan usually.
So if we are facing incident then we need to analyse it and
add it to the test plan by adding either in risky
section,constraint section..incase if it can be overcome by
any other testing methodology then we can add those in our
testing technoque
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
In which all places, testing is done?One is from the server by calling server name.Can u suggest others?
how can we do database testing. In database testing we verify the data integrity and data validation. how can we do testing of Index, triggers, views, ransactions,cursors etc
wat is test management ?what are the components available in test management?
How do you get programmers to build testability support into their code?
What is meant my Firewall testing? how the testing is performed on it?
What type of testing you perform in organization while you do system testing, give clearly?
What is a maturity level?
Can some one help me writing a manual test case for email applications like yahoo i need for www.everonn.com
What is a critical bug?
whats the reason to display the password(not in encrypted form) in the script in load runner but not in QTP?
What are the different cost elements involved in implementing a process in an organization?
What are the advantages of black box testing?
What r the functional testing u perform?
Why would we not include these?
What is stub?