What is construction joint and
expansion joint in CC pavements
Answer Posted / nisha a.s
The concrete expands with a rise in temperature and
contracts with a decrease in temperature. To account these
effects dowel bars are used at regular intervals as
construction joints.
| Is This Answer Correct ? | 31 Yes | 24 No |
Post New Answer View All Answers
I need to constructive work in amaraj batteries
how to calculate load bearing column
a butt weld is specified by
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
Currently my house construction is going on but we just realized that the portico earth beam couldn't connect with the original earth because the beam rod not extended so Please advice
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
Which IS Code/American Code applied for coupler test of steel
How to check slab shuttering level.? Or check list for slab ?
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
The mixture of different ingredients of cement is burnt at?
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
What are the RISKS during the project construction?