WHAT IS SETUP TIME,OPERATION TIME
Answers were Sorted based on User's Feedback
Answer / dhaval samanai
time require to to make setting
time requre to complete operation
| Is This Answer Correct ? | 16 Yes | 6 No |
Answer / shantan kumar.r
Setup time is the time required to bring an action into
ready state.
Operation time is the total time taken to complete the
operation of the setup.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / guest
SET UP TIME:THE TIME TO MAKE FIRST ACCEPTED PIECE WHICH
INCLUDES BRINGING ALL THE TOOLS ,JIGS AND FIXTURES,SETUP
THOSE JIGS ETC;FOR PARTICULAR BATCH QUANTITY. WHERE AS
OPERATION TIME IS THE TIME WHICH WILL BE THE TIME TO
COMPLETE EACH.
| Is This Answer Correct ? | 12 Yes | 7 No |
Answer / prabhat kartikey , me, iem, sg
Setup Time is the Machine Sating Time for Operation such as
tool setting,jigs And fixture Setting Etc.
Whare As poperation time is the total operation time or we
can say operation cycle time.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / amols
Setup time - Time Require for Setting Object for
Machining/Assembly of Part
Operation time - Time require to perofrm operation
fromstart to end ( actual Operating )
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / venkat
total time is set up time for process but operation time is
time taken to finish the operation only not the process.
| Is This Answer Correct ? | 0 Yes | 0 No |
plz send me l&t auestion papers. i have been called for written and interview industrial automation 2 yrs exper. send me on mail pal_deepak06@yahoo.com
How can we calculate one operator can 2 to 3 machine? Is it any calculation for this.
Share with us about a time when you had to present a proposal to a person of higher position and were able to do it successfully?
which documents required for Q.A.
what is principal of work o ring?
Explain about fire hydrant and its related water pressures?
What are the major disadvantages of product grouping?
how to find earth pit resistance in simple method?
reversing of each word in the string
How the costs of the products and throughput time can be reduced while handling materials?
any body tell me why 4-20 ma use as a current any reason for this amount why not 3-25 ma?
Distance to be maximum distance we can install instruments from PLC panel?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)