Define each of the following and explain how each relates to
the other: Unit, System, and Integration testing.
Answer / rajesh.pothina
UNIT : initially after finishing the codeing this is done
SYSTEM: to check whether the whole process is going well or
not
INTERGATION: to check the flow from one module to another
module.
THE LINK IS FIRST THE UNIT TESTING WILL COME THEN SYSTEM
TESTING AND THEN INTEGRATION TESTING.
| Is This Answer Correct ? | 1 Yes | 3 No |
How Requirement is linked with traceability matrix. Give proper example
wat is exploratory testing? how can u do ?
Who assign Bug Id & Bug Version Id?
what are testing Techniques? Pls answer
what should we do if the developer rejects the bug?
difference between QA, QC
how do you manage the testing for enhancement projects
If a test script instructs WinRunner to open an application to test it, what end conditions might be good?
Once a bug is found how do u report it?wat is the process?
prepare test cases for file copy paste.
Define performance and stress testing?
What we do in performance testing? Is it possible without any tool?