What is enqueue time ?
Answers were Sorted based on User's Feedback
Answer / nash
time taken by the dialog process to communicate with enque for obtaining locks while updating a record is known as enque time.
the response time of enque time is 5 milli secs in Central instance or 50milli secs in Dialog instance.
Is This Answer Correct ? | 8 Yes | 1 No |
Answer / satya
The time taken by the dialog process and obtain the a lock
on that record refereed as enque Time
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / madhu arla
if it is central instance 1ms-5ms
if it is dialog instance 100ms
Is This Answer Correct ? | 1 Yes | 2 No |
Answer / kiran
Enque time on the central instances in 1ms to 5ms
where dialog instance for 5ms to 100ms, in the sytem we got one Central instance and many dialog instances(application servers)
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / s.m.feroz ahmed
Hi ,
Enqueue time is defined as Time Independent or Time
Independent.Time dependent is defined as a job scheduled on
a specific time of Mode and Time independent is defined as
a job scheduled at the same time when it is created.
Is This Answer Correct ? | 3 Yes | 6 No |
Answer / abdul azeez
1 milli second in instance and 100 ms in central instance
(abdul azeez)
Is This Answer Correct ? | 0 Yes | 7 No |
How to schedule background jobs at OS level?
How can you tell if a transport is in the process of being imported?
What is difference between sm50 and sm66?
What are the diffrent types of table buffering ? Is it "rollin , rollout ".
ecc full form
If i want to increase Dialog WP in process what is the procedure to increase the Dialog WP?
What is the difference Between Role and Profile
20 Answers Accenture, HCL, REL, TCS,
As a basis consultant what we have to do if a background job is cancelled?
If the program buffer Hit Ration is <98%, then what should be done by the Basis consultant?
All the background jobs are in released state and there is a delay time and the background work processes are in wait status. What could be the reason why the jobs are not in ready or active state and the solution?
How to increase tables space, resizing, backups and in what situation are these done?
How to prevent other users to send mails from SAP?