3) What is PDCA Cycle?
Answer Posted / ravi
The PDCA (Plan->Do->Check->Act )cycle is designed to be used
as a dynamic model. The completion of one turn of the cycle
flows into the beginning of the next. Following in the
spirit of continuous quality improvement, the process can
always be reanalyzed and a new test of change can begin.
This continual cycle of change is represented in the ramp of
improvement. Using what we learn in one PDCA trial, we can
begin another, more complex trial.
Plan - a change or a test, aimed at improvement.
# In this phase, analyze what you inted to improve,
looking for areas that hold opportunities for change. The
first step is to choose areas that offer the most return for
the effort you put in-the biggest bang for your buck. To
identify these areas for change consider using a Flow
chart<link> or Pareto chart<link>.
Do - Carry out the change or test (preferably on a small scale).
# Implement the change you decided on in the plan phase.
Check or Study - the results. What was learned? What went wrong?
# This is a crucial step in the PDCA cycle. After you have
implemented the change for a short time, you must determine
how well it is working. Is it really leading to improvement
in the way you had hoped? You must decide on several
measures with which you can monitor the level of
improvement. Run Charts can be helpful with this measurement.
Act - Adopt the change, abandon it, or run through the cycle
again.
# After planning a change, implementing and then
monitoring it, you must decide whether it is worth
continuing that particular change. If it consumed too much
of your time, was difficult to adhere to, or even led to no
improvement, you may consider aborting the change and
planning a new one. However, if the change led to a
desirable improvement or outcome, you may consider expanding
the trial to a different area, or slightly increasing your
complexity. This sends you back into the Plan phase and can
be the beginning of the ramp of improvement.
cheers
ravibyndur@yahoo.com
Is This Answer Correct ? | 30 Yes | 0 No |
Post New Answer View All Answers
what are risks and contigencies(solutions) of an ecommerce (online shopping and bidding project)application?we describe this in Test plan can anyone tell me abt this?
name poneno dept sun 9894433467 computer This is the xls sheet a programs written to transfer this data into database write test cases and test scenario?
What is smoke test? Do you use any automation tool for smoke testing?
test cases for compose functionality of gmail
How to test the Online Games?? Suggest tricks. I have experience in server-client application testing.
What are similarities of Agile and Scrum?
Which of these techniques is not useful for partition testing at the class level Option 1 attribute-based partitioning Option 2 category-based partitioning Option 3 equivalence class partitioning Option 4 state-based partitioning
Please can any one tell me 1).Types of reports 2).Types of Meetings.
is it not possible to automate full project??what r the parts in project that cant be automated(tht has to be done manually)?
could anyone explain application testing in sequence order i don't have any experience in that
How to do Pixel Size testing in a PDF document. Is there any Open tool that will be avaiable?
What is localization testing (l10n testing)?
What is coverage and what are the different types of coverage techniques?
What is test management?
what is coupling integration testing