U are a civil engineering student?why do u want to enter
into IT industry
Answer Posted / banti
When compared to civil engineering there are many onsite opportunities in IT sector so i have choosen IT sector
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
What are the disadvantages while using stone dust as filler in pavements?
why are you joining in this (applied post) job and your aim for this job
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
The foundations are placed below ground level, to increase?
What are some structures that may be subjected to fatigue?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
how many litres of enamel paint required for 5000 sft of site??
How many Sft of Level Plaster per Kg
How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Bernaullis theorem deals with the law of conservation of mass momentum energy none
Formula of area of crane hook
Test procedure of fly ash bricks as per code ?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is a kip?