what is CBR Test

Answer Posted / emmanuel

This is a ratio of penetration of a standard plunger at a standard rate in a soil sample placed in a standard CBR mould to the penetration of the same plunger in a standard material.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Cement consumption of one cubic meter of aerocon blocks masonry?

3685


one steel fixers how much ton steel fabrication he will do same how much tone he will binding?

1484


How much cement and water required for cement selery????

1434


What is semirigid connections?

1643


What is dead load impact load live load

1381






what is hydrostatic paradox?

1719


The foundations are placed below ground level, to increase?

796


i want to ecil (Electronics Corporation of India Limited Hyderabad) previous civil engineering question papers immediately please.............

2648


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2397


What is Critical path in Ms-Project ?

706


how to calibrate the RM 800

1862


is there any codal provision for soil cousion over the Hume pipe of Dia 1.2 m.

1589


what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.

1901


What is an object snap mode?

740


What is proportion of PCC Grade G?

1607