Why attemperation is required in HRSG in a combined cycle
power plant?

Answer Posted / sunil

In CCPP secondary superheater coils are located near to flue gases and exhaust of gas turbine enters boiler . Exhaust of GT are at high temp around 600C

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

LAPT working in alternator / generator

2561


Which will have more strain energy 1.Spring 2.Circular disc 3.Solid square plate.

1890


By any way can we increase the B check hours from 300 to 500

1703


why airtel use + 24 volts and other operators use -48 volt

2113


what's the moog valve

1067






What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?

1940


How do you consider that you can improve and what assistance do you need to achieve this

1342


can dp type level transmitter work in under vaccum condition

1548


What is LB-SR.

2491


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1284


Looking for Bently Nevada surplus 3300/52-01-00-00 Reverse Rotation Monitor , 4 pieces.

2992


what is restricted earth fault explain in details

1632


dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job

2078


what is the difference between compensated & normal drum level in boiler drum?

1300


How We Calibrate the vaccum transmitter?

1475