how shall you calculate PLF on the basis of percentage auxillary load factor
Answer Posted / ramakrishna karri
ratio between average load to peak load in a specified time period. high Load factor means plant running consistently is good.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.
what is restricted earth fault explain in details
can dp type level transmitter work in under vaccum condition
operation
What is difference between secondary Air & Tertiary Air and Their use.?
how to differentiate between "ALL fuel lost" and "All Fuel Lost" in Boiler MFT condition?
what does mean by kva rating
How We Calibrate the vaccum transmitter?
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
what's the moog valve
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
What is LB-SR.
some one can tell me how residual type excitation is provided through transformers to an AC generator without any battery or PMG&excitor