How to calculate cement quantity in m20 concrete
Answer Posted / jayaprakashsst
M20 concrete means 1:1.5:3
M20 = 1:1.5:3
Volume = 1+1.5+3=5.5
Total volume ingredients for using =1.57
Volume of broken stone Require = (3/5.5) x 1.57 = 0.856 m3
Volume of sand Require = (1.5/5.5) x 1.57 = 0.471 m3
Volume of cement = (1/5.5) x 1.57 = 0.285 m3
= 0.285 x1440 = 411 kg = 8.22 bags
Is This Answer Correct ? | 14 Yes | 1 No |
Post New Answer View All Answers
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft
how to calculate the chair reinforcement length in slabs, footing or anywhere??
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
Where is the worlds longest elevator and how long is it?
What is pre-stressed concrete?
how can i calculate cement in brickwork
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
any book or article on pumped concrete.
Difference between pre-tensioning and post-tensioning.
can you provide a link for manual design of building?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
how to absorb to site basic corrections? which are the important correction?
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
what happening if we casting HV shunt reactor foundation pad at 50cm height different time (One day difference)