how to calculate concrete qty for footing using M25 grade
1:1:2 for 731 cft.
Answer Posted / vijayababu`
M25 – 1:1:2
Total parts – 4
Cement Required for 1 cum =1/4X1.57X1440
= 0.393X1440 = 567kg/cum
= 11.34 bags/cum
| Is This Answer Correct ? | 17 Yes | 3 No |
Post New Answer View All Answers
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
What is the difference between chamfer and fillet?
what is Brick crushing strength(PSI)?
Define line type?
What is the snap size in civil and how can we create it?
what is work of planning deptt. in any construction compny (in road project)
Which Types Of Bricks ?
Which IS Code/American Code applied for coupler test of steel
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how many types of survey and what are levelling instrument?
1) write Short notes about Shellow & Deep well? 2) What is the full form of SPT & SMB? write short notes. 3) write short notes about efficiency of Riveted joint.
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?