how many litr. of paint will required for 1 sqm area of wall(internal wall and external wall) ?? 

Answer Posted / monik kukadiya

1000 ltr

Is This Answer Correct ?    2 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.

1594


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

1600


what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building

1942


what is the 0 value in quantity surveying

1932


is concealed wiring a problem in fly ash brick wall?

2079






How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)

1392


What is braced excavation all about?

731


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2119


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1285


in one SQM plaster how much Cement and sand consumed in ratio 1:4

1677


How much for the BRC lapping in full yield and half yield < and which table to get it ?

2037


Volume of 25kg putty bag & 40 kg putty bag volume??

1600


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1530


primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above

1648


How much is the cover for slab?

740