how must steel will use for 1 cubic meter.formula of steel
for beam,column,lantern.
Answer Posted / ram punnam
For Footing & Pedastral 1-1.5% of Volume of Concrete
For Columns 2-2.5% of Volume of Concrete
For plinth beam 1.5%-2% of Volume of Concrete
For Roof Beam 2-2.5% of Volume of Concrete
For roof slab 1-1.5% of Volume of Concrete
For RCC Road 0.5-1% of Volume of Concrete
Is This Answer Correct ? | 26 Yes | 14 No |
Post New Answer View All Answers
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Under what circumstances should pot bearings be used instead of elastomeric bearings?
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what is project?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
Basic questions of civil engineering
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
step by step procedure to find out the percentage of steel in coloum,beam,slab,footing in detailed
column at edge of a framed structure is uniaxial or biaxial. and is an interior column is biaxial
specifications of fe500 steel
what discoveries did you have in relation to your course?
What is a hatch patterns?
WHAT WII BE THE WATER ABSORPTION POWER OF WOOD ?
List out some of the common problems that architect have to tackle it?
How to calculate thickness of MAT slab & Reinforcement? The dimention of under ground water reservoir is 80'X14'X 12 ft