how can we calculate the cutting length of 10,12,16,20 and
so on iron bars for 45 digree and 90 digree bents plz tell
me if there is any formula or tabel to find it

Answer Posted / abhay

The best way to find out the cutting length of bar:
1 Check dia of bend of bar given in specification.
2.follow the formula given in BS 8666:2005 ir IS 2502-1963

this is best
good luck!

Is This Answer Correct ?    12 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2104


types of laps in column

1923


How to calculate dry of volume of concrete constant?How it comes 1.54 or 1.57

1512


what is the most suitable foundation when construct a bird watching tower in a marshy land

1429


I have an span length 16 ft c/c

1069






can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.

1591


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1506


I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com

1855


within an emergency scenario what are the safe systems of work a coss can setup as part of is duties

1585


Anyone have sample questions for bhel interview.please send me as Iam appearing for the interview on 19th sep2008. Kindly send this to my e-mail: arun_prasath_n@yahoo.co.in

1604


Explain the difference between slab and beam?

668


Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.

1427


How to calculate quantity of plum masonry in 1:3:7

2526


How to calculate the load of partion in flat slab if we use brick?

1392


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

1576