8 man work for 6 days to complete a work. How many men are
required to complete same work in 1/2 day.
Answer Posted / parthi
48 mens are required
to complete the work in
1 day. So 96 mens are
required to complete
the work in 1/2 day.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
A clock with the hours round the face in Roman block numbers, as illustrated in the sketch fell down and the dial broke into four parts....
If two pencils cost 8 cents, then how much do 5 pencils cost?
The price of Machine D equals the sum of the prices of machine A, B and C whose price are in the ratio 2:3:4 respectively. If weights of A, B, C and D varies as square of its individual price and difference of weight of D and A, B and C together is 9880 kg. Then what is the weight of D?
The area of the quadrilateral is 36 What is a*b
Aeroplane is flying at a particular angle and latitude,after some time another latitude is given..(8 hrs later), You are asked to find the local time of the place.
A man spends half of his salary on household expenses, 1/4th for rent, 1/5th for travel expenses, the man deposits the rest in a bank. If his monthly deposits in the bank amount 50, what is his monthly salary ?
How many different 9 digit numbers can be formed from the number 223355888 by re-arranging its digits so that the odd digits occupy even position?
Every station in N rail road issue every other station's ticket. some stations are added.Now they have to issue 46 more tickets. say the No.of stations after and before added.
1,40,00,000 pencils are put up straight. all the pencils are of length range 3 to 6 inches. 80% of the pencils have average of five inches. so the find out the total length spanned by the pencils.
5) DB2 maintains information about the data a) In Tables b) In a set of tables known as DB2 catalog c) In DB2 database d) None of the above
A bag contains 6 black and 8 white balls. One ball is drawn at random. What is the probability that the ball drawn is white?
An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
PROCESS FLOW IN LOGISTICS
Three friends divided some bullets equally. After all of them shot 4 bullets the total no.of remaining bullets is equal to that of one has after division. Find the original number divided.
if a man byes 1 lt of milk for 12 rs and mixes with 20% of water and sels it for rs 15 thgen what is percentage of gain