what is the cutting length of 90 degree bend in four corner
ring in column of 8mm dia size of column 450mmx250mm of
clear cover 20mm?
Answer Posted / dhaval
A= 450-2*20-2*8 = 394
B= 250-2*20-2*8 = 194
length = 2*(A+B)+4*6*DIA = 2*(394+194) + 4*6*8= 1368mm
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
The building has 12 columns of 12x9 in 3 rows of 4 each in a plot of 50'x30', The central row is strengthened with 16mm twisted rods. The roof area is 1500 sft including balconies. calculate the load factor per sft. Also indicate the number of roofs the building can withstand.
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
"Gates of the dams are generally designed of curved shape". Why?
calculate the quantity of water for 1:6 cement mortar
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
what else we can add rather than admixture in concrete to reduce the cement quantity?
how to calculate total cost for slab 35'×8'
cause of cylinder test failure
What is min thickness,min grade of conc & age of PQC ?
where can i get the previous question papers for rrb section enginerr (civil)
What are the different types of foundation?
How to calculate the quantity of ingredients of M20 grade concrete?
How many litres of water used for curing of 1000sqft of slav