In star and delta
connected
systems , for
driving power and
as well as light
load which one you
will preferred?
Answer Posted / hiren patel. ms uni.baroda.
I PREFERRED STAR CONNECTION BCZ OF UN BALANCE LOAD .
DIFFERENT EQUIPMENT USED FOR LIGHT & POWER LOAD .DELTA CONNECTION USED WHERE BALANCE LOAD IS USED.
Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
im working in one private compeny in gujarat. i was complet diploma electric in 2010 from gujarat technical board. now i want electric supervisor licence in gujarat but i dont't know when i apply? plz give me address of the licence dippartment office in gujarat. gandhinagar
what is meant by 2 within a star in a voltmeter dial?
WHAT IS THE TOTAL POWER GENERATION IN CHHATTISGARH?
do you have some of interview Questions in power and genrator section in general whith answers
how to choose cable size with respect to load? how to convert cable size in mm2 to sq.mm?
how to select diiferent power transformers of same capacity on no load loss and full load loss by economical point of view.?
when the time of backcharging the transformer three phases only enough or three phase with neutral is must.from these which one is the best one.
The moisture in air will condense at
how choose conductor&depending upon load
what is residuel magnetism. and how order lead acid batteries for 24 volt. emergency lighting system.
WHaT IS THE CONCEPT OF INDUCTION LAMPS IN MODERN LIGHTINGS, and HOW IT WORKS TO EMIT LIGHT ( AS NO ELECTRODES ARE PRESENT ) ?" COULD INDUCTION LAMPS CAUSE INTERFERENCE WITH COMUNICATIONS INTO A STORE USING INDUCTION LIGHTING ? WHAT IS THE BENEFIT OF USING THE LOW FREQENCY INDUCTION LAMP , VERSUS LED , AND VERSUS FLUORESCENT, AND VERSUS ANOTHER KIND OF LIGHTING . THANK yOU MOISES GUINDI
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
design a 3 bit synchronous and asynchronous counter using T- flipflop
how to fit 3 HP crompton gear motor with conveyor with the use of staring delta starter or ordinary starter?
why ahould you show client/engineer activities clearly on the project plan