1.Suppose my file has 10 fields and I want to make the 2nd
field Zeros in all records. And assume I have millions of
records and I dont want to read each record and update the
desired field with 0. Any other way to do this in one step
operation?
2. Assume my file has 100 records and I want to see only
first 10 records. Is this possible through LF?
3.I have 3 jobs A B and C. I want to submit B after
successful completion of A and want to submit C after
successful completion of B. Without using job scheduler or
job queue, how can i do that through CL program?
4.What is difference between Bind by copy and bind by reference?

Answer Posted / sujatha

3. Submit job B can be included at the end of call program
in SBMJOB A. Likewise SBMJOB C can be done at the end of
call program of job B.

SBMJOB Call A

Program A:
----------
PGM
....
....
MONMSG CPF0000 GOTO END
SBMJOB B
END: ENDPGM

Program B:
-----------
PGM
.....
.....
MONMSG CPF0000 GOTO END
SBMJOB C
End: ENDPGM

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

give an eg of ACQ-(ACQUIRE),BIT OFF,BIT ON,DEALLOC,DUMP,FEOD,FORCE,MHHZO,MHLZO,MHLLZO,MLHZO,REL,RESET,TESTZ,TESTB,TESTN----GIVE SMALL EXAMPLE TO THE OPCODES...TO UNDERSTAND FUNCTIONING...........

3297


can you debug ile rpg program using isdb?

748


what is data area and how it is used in rpg program ?

764


what is an online rpg?

741


what is the difference between do while and do until?

722






how do you use commitment control in rpg?

768


How to define data area in RPG program? In which scenario multi occurrence DS is use in AS400?

1569


How to select highest score of each subject or how to select highest income of every month?

1303


what happens when sflsiz = sflpag? What are the advantages and disadvantages?

720


How to handle duplicate error handling in RPG?

1700


How would display prime numbers using CL program?

5697


is this a rpg channel?

691


what was the robotech rpg?

691


how do I preserve and clean the array?

683


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1768