What is meant by 'zero value' in quantity surveying.

Answer Posted / ilayaraja

Difference between BOQ cost and actual cost.

Is This Answer Correct ?    14 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why should pumping be not used in case of concreting works?

1001


Explain the design for rcc multi-storied building?

704


Aptitude, reasoning, quants, verbal and technical question

1001


What are the responsibilities of a construction manager?

799


What is gravity flow?

693






Why is concrete cube test carried out?

784


How are freeway bridges built?

854


what is the Asfalt test?in road constraction..?

1658


What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?

678


GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?

6849


if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.

1685


please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches

2124


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1182


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1218


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1514