What is meant by 'zero value' in quantity surveying.
Answer Posted / ilayaraja
Difference between BOQ cost and actual cost.
Is This Answer Correct ? | 14 Yes | 2 No |
Post New Answer View All Answers
Why should pumping be not used in case of concreting works?
Explain the design for rcc multi-storied building?
Aptitude, reasoning, quants, verbal and technical question
What are the responsibilities of a construction manager?
What is gravity flow?
Why is concrete cube test carried out?
How are freeway bridges built?
what is the Asfalt test?in road constraction..?
What is the ratio of grades m5, m7.5, m10, m15, m20, m25, m30, m35, m40?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force