Why attemperation is required in HRSG in a combined cycle
power plant?
Answer Posted / sitaram singh .bonduli
As the steam generated in HRSG shall be routed to the main steam pipeline of steam turbine , it should meet the design criteria (Design temp) hence The attemperation serve the purpose when Rapidly varying load conditions takes place.
Is This Answer Correct ? | 10 Yes | 3 No |
Post New Answer View All Answers
can dp type level transmitter work in under vaccum condition
what is the difference between compensated & normal drum level in boiler drum?
what does mean by kva rating
im try to calculating seawater flow required for SW-FGD system. I need a guide, equation or method to do it, can some one help me! Thanks very much
what is natural frequency of turbine shaft .
LAPT working in alternator / generator
We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
operation
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon
can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525
what's the moog valve
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
By any way can we increase the B check hours from 300 to 500
What is LB-SR.