Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why expansion bellow is provided in between hopper and vessel
in ash handling plant?

Answer Posted / jitendra sharma

The purpose of expansion below is to provide isolation from
vibrators which are mounted on the surface of the vessel.

Their are several no's of vibrators, to remove the fly ash
contents before it's temperature decreases to prevent
solidification of fly ash on the walls of vessel.


All u know that we remove the fly ash from boiler tubes and
APH with help of soot blowing.

Is This Answer Correct ?    8 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

procedure of how to generate power in solar plant.

1963


what is restricted earth fault explain in details

2065


why airtel use + 24 volts and other operators use -48 volt

2642


Why superheated are started before I'd and rd fan?

2200


what is the meaning of SST300 V56A in SIEMENS turbine

4373


We have Demin Closed cooling water system with expansion tank for cooling oil system. Expansion tank having N2 bladder. Whenever N2 bladder bursts out, Closed cooling water circuit pressure drops and make-up happening, eventhough there is no leaks. And how Circuit pressure drops?

1933


Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2507


How do you consider that you can improve and what assistance do you need to achieve this

1777


How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.

2304


DCS marshaling Cabinet Power supply can be replace during plant running time? Answer Yes it is possible. I am talking about the controller and cards power supply modules. They are always redundant and connected through diode so that if one power supply fails the other can take the charge immediately.so it is possible to replace one of them in running plant if the other one is healthy. MY question is how switching done.

1017


operation

1920


can u please tell me how to calculate the concrete quantity for a under reamed pile? r=300mm,depth=3m for a cylinder and for bulb l=.750mm,width=.525

1760


How to calculate power press toneage

2081


what is the trip circuit supervision in an electrical meaning?

2148


can dp type level transmitter work in under vaccum condition

1999