Hi guys,
If the client identified any bug or defect in the
application, they will report to support team or production
team initially, after that they will review and give proper
explanation about this bug.
after that they will send to corresponding module team (
internally Project Manager will arrange a meeting with all
the leads (Dev. Manager, Test Lead and Requirement Manager)
if the spec is not clear then raise a Change Request.
Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
Testing activity which is performed to expose defects in the interfaces and in the interaction between integrated components is?
What is positive testing?
How the 2 wings and body of the butterfly model of test development is represented?
what should be analyzed in laod testing?
What is the difference between Manual Test Plan and the Automated Test Plan?
When should 'regression testing' be performed?
What is the purpose of exit criteria?
viewing entire results after the batch run in qtp Is there is a easier way view the complete results with out opening one by one test scripts
Test Items and Feature To Be Tested for calculator
What are the layers of FCOE Protocol?
What is the major problems you resolved during your testing process?
What is dre?
i am a PG science(chemistry),now am working test engineer in small organization,now i will decide to move better organization please send model cv and advises
In the 7 Stages of the SDLC (Planning, System Analysis, System Design, Development, Testing, Implementation, and Maintenance), WHO are the stakeholders of each stage?
HI to all this is dinakar i am planning to write istqb foundation level exam but i dont have the material so any one have material regards that one please send to my id was dinakarmails@gmail.com thanks alot in advance